94% (105 drill holes) of the 112 drill holes proposed for the E1, E2 and E3 series resource blocks, located in the south-southeast area of the MCM concession, now have been completed. - Work is underway to excavate a bulk coal sample ...
94% (105 drill holes) of the 112 drill holes proposed for the E1, E2 and E3 series resource blocks, located in the south-southeast area of the MCM concession, now have been completed. - Work is underway to excavate a bulk coal sample ...